Plan shutdown and maintenance supply requirements from China around the materials list, operational priorities and the required arrival date.
Products and supply scope
| Requirement | Scope to specify |
|---|---|
| Planned maintenance materials | Model-specific spares and replacement components. |
| Plant consumables | Filtration, sealing, flow-control and other specified requirements. |
| Phased supply packages | Critical line items separated from later delivery requirements. |
Prioritize the critical path items
Send the equipment list, part references, quantities and target dates. Identify items that determine shutdown readiness and the documents or inspection release needed before dispatch.
Request a China supply quotation
Send your RFQ or BOQ, quantities, delivery country and required date through the contact form. List any drawings, datasheets or photographs you hold; the form carries text only, and we will say where to send the files. State whether alternatives may be considered and which requirements are mandatory.
Compare the agreed offer
The proposed manufacturer, supply basis, documentation, minimum order quantity, price and lead time are confirmed for the particular quotation. Identify technical deviations and compare offers against the same packing, inspection and delivery scope.
China sourcing RFQ checklist · Supplier verification · Inspection planning