Send ORINOV your filtration or separation requirement for China supply review, from replacement elements to specified equipment assemblies.
Products and supply scope
| Requirement | Scope to specify |
|---|---|
| Replacement filter elements | Installed manufacturer, model, part reference and dimensions. |
| Filter housings and assemblies | Flow, media, pressure, temperature and connection requirements. |
| Separation consumables | Required construction, performance designation and fit. |
Build a replacement-filter enquiry
Identify the application, media, operating conditions, target filtration requirement and housing interface. For replacements, attach a drawing or clear photographs and indicate whether original or alternative supply is acceptable.
Request a China supply quotation
Send your RFQ or BOQ, quantities, delivery country and required date through the contact form. List any drawings, datasheets or photographs you hold; the form carries text only, and we will say where to send the files. State whether alternatives may be considered and which requirements are mandatory.
Compare the agreed offer
The proposed manufacturer, supply basis, documentation, minimum order quantity, price and lead time are confirmed for the particular quotation. Identify technical deviations and compare offers against the same packing, inspection and delivery scope.
China sourcing RFQ checklist · Supplier verification · Inspection planning