Inspection Plan

Define the inspection scope before buying oilfield equipment or industrial components from China. Inspection requirements should follow the product’s function, application and purchase specification.

Set the acceptance basis

Identify the controlling drawing, revision, product specification and acceptance criteria. State who approves deviations and which inspection stages require buyer attendance, review or release.

Choose the relevant inspection stages

Stage Typical review points to consider
Before production Approved scope, materials, drawings and required records.
During production Specified process checks, dimensions and traceability.
Final inspection Identification, quantity, dimensions, agreed tests and document review.
Before shipment Packing, protection, marking and shipping-document consistency.

Agree the records and release process

List the required inspection reports, test results and certificates in the RFQ. The manufacturer and any inspection provider should confirm feasibility, access, timing and cost. An inspection report only covers the work and acceptance criteria actually performed.

Send the inspection requirement with the RFQ

Attach the relevant specification and inspection plan to your China supply enquiry. Late changes to inspection or testing can affect price and delivery planning.